Electronic Application Process (SAAEAPS) page / Verification Steps window |
The Manual Application Verification Steps section is used to display, add, or update data relative to manual verification steps for a person.
Manual verification steps are defined on the Application Verification Steps Validation (STVASTA) page. Those with a checked Load Indicator (set to Y) will be automatically attached to each application record when an electronic application is received. You can also attach additional manual verification steps, if required. Use the Return button or a Count Query Hits function to return to the Electronic Applications section of the main window when you are finished working in this window.
The following fields are in this section.
Fields | Descriptions |
---|---|
Step | The Step (Code) field displays the code of a manual verification step attached to the application. It can also be used to add steps for the application. If entered, values must be valid on the Application Verification Steps Validation (STVASTA) page for steps defined for applications. Use a List function to display a list of valid codes. When a valid code is entered, its description will also display. List Application Verification Step Codes (STVASTA) |
Add Date | The Add Date displays the date on which a manual verification step was attached to the application. It is a display-only field. |
Completion Indicator | The Completion Indicator check box displays the status of the manual verification step. It will be unchecked (set to N) when a new step is added, and must be checked (set to Y) manually when the step has been completed. When all manual steps for an application are complete, the Application Status (Indicator) in the Electronic Applications section of the main window of this page will also be checked (set to Y). Checked (set to Y) and unchecked (set to N) are the only valid values. |
Completion Date | The Completion Date displays the date on which the step was completed and the Completion Indicator checked (set to Y). It will default to the current date when the Completion Indicator is checked (set to Y), but it can be changed to any other valid date. |